Project Overview: Acute Civil Engineering were employed to design a drainage solution for a newly installed crane base. The location of the crane base clashed with several existing surface water drainage runs that carried the symphonic drainage system from the roof of the building. Acute Civil Engineering designed a solution around the crane base and minimised further excavations in the client’s yard.
Acute Civil Engineering were employed to undertake the following civil engineering works at Arconic Phase 2, Rotherham. Our contracted works are as follows;
Client: Hawkins Projects Limited
Value: 105k
Weeks: 6
Completed: April 2021