Project Overview: Acute Civil Engineering were employed to undertake the following civil engineering works at Unity Collge, Burnley. Our contracted works are as follows;
Erect heras type fencing to perimeter of the site
Cut & fill original ground to form a level area in the location of the building
Install new SW attenuation pipework to the existing swale
Install new FW pipework system to the existing network
Design and install 36no pad foundations
Install comms, power & water supplies
Install tarmac footpaths and ramps
Re-visit 12 months from commencement to put the area back to original levels and remove all installed elements.
Client: Portakabin
Value: £60k
Weeks: 9
Completion Date: September 2021