Unity College

Burnley

Project Overview: Acute Civil Engineering were employed to undertake the following civil engineering works at Unity Collge, Burnley. Our contracted works are as follows;

  • Erect heras type fencing to perimeter of the site
  • Cut & fill original ground to form a level area in the location of the building
  • Install new SW attenuation pipework to the existing swale
  • Install new FW pipework system to the existing network
  • Design and install 36no pad foundations
  • Install comms, power & water supplies
  • Install tarmac footpaths and ramps
  • Re-visit 12 months from commencement to put the area back to original levels and remove all installed elements.
Client: Portakabin Value: £60k Weeks: 9 Completion Date: September 2021